What's the difference between
and
Enter two words to compare and contrast their definitions, origins, and synonyms to better understand how those words are related.

Ploy vs Blueprint - What's the difference?

ploy | blueprint |

As nouns the difference between ploy and blueprint

is that ploy is a tactic, strategy, or gimmick while blueprint is a type of paper-based reproduction process producing white-on-blue images, used primarily for technical and architecture's drawings, now largely replaced by other technologies.

As verbs the difference between ploy and blueprint

is that ploy is (military) to form a column from a line of troops on some designated subdivision while blueprint is to make a blueprint for.

ploy

English

Etymology 1

Noun

(en noun)
  • A tactic, strategy, or gimmick.
  • * {{quote-magazine, date=2013-06-22, volume=407, issue=8841, page=70, magazine=(The Economist)
  • , title= Engineers of a different kind , passage=Private-equity nabobs bristle at being dubbed mere financiers.
  • (UK, Scotland, dialect) Sport; frolic.
  • Etymology 2

    Probably abbreviated from deploy.

    Verb

    (en verb)
  • (military) To form a column from a line of troops on some designated subdivision.
  • (Wilhelm)
    Antonyms
    * deploy (Webster 1913)

    Anagrams

    * ----

    blueprint

    Alternative forms

    * blue print, blue-print

    Noun

    (en noun)
  • A type of paper-based reproduction process producing white-on-blue images, used primarily for technical and architecture's drawings, now largely replaced by other technologies.
  • A print produced with this process.
  • (architecture, engineering, by extension) A detailed technical drawing (now often in some electronically storable and transmissible form).
  • (informal, by extension) Any detailed plan, whether literal or figurative.
  • Synonyms

    * (paper-based technical drawing) cyanotype, schematic * (detailed technical drawing) schematic * (informal) road map, schematic, plan, layout

    Verb

    (en verb)
  • To make a blueprint for.
  • The architect blueprinted the renovation plan once the client had signed off.
  • To make a detailed operational plan for.
  • They blueprinted every aspect of the first phase of the operation.